In 2011 Technip-EPG commissioned Conbit to design and calculate the structural steel, supporting an onshore filter skid. The skid was supplied to the Abadan refinery in Iran.

The skid was a part of the contract of Dahlman, which is a worldwide provider of industrial filtration solutions.

 

MODULE DESCRIPTION

The approximate frame dimensions are (LxWxH) 6x5x15.2m

On the north side of the frame a staircase is placed in line with the steel structure. The

total dimension of the frame with staircase included is (LxWxH) 9x5x15.2m..

The steel frame package unit consists of a bolted steel structure with bracings including 6 lifting lugs for

vertical lifting of the frame in a horizontal position and tilting it to a vertical position.

Related case studies

Guy wire maintenance – Oman

Conbit was contracted to perform the tensioning work to a flare stack for OXY OCCIDENTAL in Oman. The end termination of the wire ropes had to be reinstated to the prescribed minimum of seven [...]

Flare tip replacement – Australia

ExxonMobil contacted Conbit for the offshore flare tip replacement project at the Snapper (SNA) platform.

Retractable flares Thailand

Conbit expertise was requested to assist with the lowering of the riser pipes of GSP5 & GSP6, so they would be accessible for maintenance. Besides supervision, Conbit was also responsible for the [...]

Contact Us

We are not around right now. But you can send us an email and we will get back to you as soon as possible.

Not readable? Change text.

Start typing and press Enter to search