Lifting assistance for helideck replacement

A helideck replacement in an offshore environment is challenging. External conditions such as wind and sea conditions need to be taken into account.

The Conbit engineers prepared all the engineering work for the replacement of the helideck. They performed all the structural analyses, design and fabrication of lifting frames and developed all the handling procedures for the transport and installation of the existing and new helideck.

Dual lifting

The lifting activities at the F15-A platform have been carried out with the Seafox 2 main crane, but because it was unable to reach every location, the F15-A platform crane was used to perform a dual lift. The Conbit team was present to prepare the units for lifting and to coordinate the actual lift. Such a dual lift operation requires good preparation, solid engineering and a competent team to carry out the job on site in an efficient and safe way.

The combination of profound engineering (structural and mechanical) and practical lifting expertise is the main benefit of having Conbit as a turnkey lifting service provider.

Related case studies

Flare tip replacement, Kashagan Onshore Processing Facility

Bongkot North Flare Tip Replacement in Thailand

Conbit was tasked with performing the flare tip replacement at the Bangkot North gas field, located 100km offshore in the Gulf of Thailand.

Transport analysis transition pieces

ALE was awarded a project to transport Transition Pieces (TPs). The TPs will be transported via the River Tees from the manufacturer to the Able Port. For this project, ALE uses two existing [...]

Contact Us

We are not around right now. But you can send us an email and we will get back to you as soon as possible.