GBA Flare Systems was contracted by Petronas to deliver the flare-tip package for the BNCPP-B offshore platform in Malaysian waters.

GBA Flare Systems in turn contracted Conbit to design and deliver a mechanical handling system for replacement of the flare tip — a combined high-pressure/low-pressure flare tip with a total weight of 2000 kg.

 

Conbit is renowned for its extensive flare-tip lifting experience and has worked with GBA Flare Systems on many successful projects.

In accordance with the client’s specifications, Conbit prepared the structural design of the flare-tip handling system, which featured a retractable davit as the main lifting equipment.

Related case studies

Flare-tip windshroud replacement – Malaysia

Conbit delivered the lifting engineering, crew and lifting equipment, as well as the offshore execution of the wind shroud replacement and flare tip maintenance works.

Offshore Flare Tip Replacement – Malampaya

Well prepared offshore flare tip replacement in the West Philippine Sea

Challenging flare tip replacement – Bongkot North

Thanks to its vast expertise in flare-tip replacement, the Conbit and CR Asia team managed to complete the operation successfully, safely and ahead of schedule.

Contact Us

We are not around right now. But you can send us an email and we will get back to you as soon as possible.

Not readable? Change text.

Start typing and press Enter to search