Latest whitepaper
Get your free 24 page whitepaper in your mailbox

This white paper contains more detailed info about our services and equipment. Also, you get inside tips from our experts.

We will not share your information with anyone. Please see our privacy statement for more information.
Conbit is working on oil and gas assets all around the globe
You will receive the whitepaper within 10 minutes in your mailbox.
While waiting...
We invite you to visit our YouTube channel here.
Didn't receive anything?
Please send us an email and one of our team members will send it through to you.
info@conbit.eu
Oops! Something went wrong while submitting the form.
Oil & Gas
Blog
Load test at Conbit yard in Eindhoven
22/11/2018

Flare Tip Load Test Using Unique Luffing System

“A unique luffing system used for 10T load test.”

The Conbit team has successfully completed a huge 10t-flare tip load test using their unique luffing system. This will be used for an upcoming replacement project in Kazakhstan.

At 10t, the flare tip is unusually heavy. Conbit developed a special luffing system in-house, ideally suited for lifting this high capacity load on a large platform.

The high-capacity luffing system will be configured to maneuver the gantry to lift the large flare tip. The system, designed as an easy-to-handle method of moving a gantry crane portal, will enable Conbit to utilize a lighter structure to lift loads quicker and at a much higher capacity.

The load test took place at Conbit’s yard in Eindhoven and was witnessed by the client. Conbit’s team pride itself on preparation as the key to project success. This load test was an essential milestone towards the successful completion of the project.

“Although we do a load test on all our lifting equipment and frames before we start a project, as part of the preparation of equipment and engineering plans, this was particularly significant considering the size of the flare tip and the use of the luffing system. This is a major milestone for the project. We are pleased with the client’s positive feedback,” explained Dries van Mierlo, Project Manager.

Based on an offshore field in Kazakhstan, the flare tip replacement project will be the first to use the luffing system. It is expected to take place in mid-2019.

The unique luffing system on project location

See how we got to work

Share this article

Related Cases

Related Services

Maritime
Wind
Oil & Gas

Inspections

Onshore & Offshore
Oil & Gas
Petrochemical
Wind

Modification

Onshore & Offshore
Oil & Gas
Petrochemical
Wind

Maintenance

Onshore & Offshore
Oil & Gas
Wind
Petrochemical
Maritime

Installation

Onshore & Offshore
Oil & Gas
Petrochemical

Decommissioning

Onshore & Offshore

Contact

We're here to answer your questions

Do you have any technical questions, general enquiries or do you need additional information? Don’t hesitate to contact our experts. With their expertise and experience in lifting services, they will gladly help you.

You can contact us by phone or email. We’re looking forward to your questions!