COMPLETE INTEGRITY PROGRAMME

Having developed a reputation in the industry for providing the complete integrity programme of guy wire structures, Conbit was contracted to undertake the necessary inspection and maintenance of the guy wires six per flare, and ensure that all five greenfield flares were vertical for NHS, with Saudi Aramco as the end client.

THE POWER OF PREPARATION

Conbit prepared extensive plans and engineering designs for tensioning the guy wires, equipment set up and equipment installation and removal procedure.

Starting with the calculation reports and method statement, the project was prepared well in advance. The team prepared drawing checks, as well as engineered new calculations to supply the full solution.

Related case studies

Flare tip replacement, D-Island, Kazakhstan

Flare tip replacement, Kashagan Onshore Processing Facility

Flare tip replacement, Marlin B, Australia

Contact Us

We are not around right now. But you can send us an email and we will get back to you as soon as possible.

Not readable? Change text.

Start typing and press Enter to search