Conbit was contracted to undertake the necessary inspection and maintenance of the guy wires six per flare, and ensure that all five greenfield flares were vertical for NHS, with Saudi Aramco as [...]
Conbit was contracted to perform the tensioning work to a flare stack for OXY OCCIDENTAL in Oman. The end termination of the wire ropes had to be reinstated to the prescribed minimum of seven [...]
Conbit was contracted to provide the engineering system and design saddles for the transportation of monopiles (MPs), as well as an X frame for transition pieces (TPs) at the ABLE UK yard, UK.